What was found
MAIN DECK CARGO COMPARTMENT FLOOR TRACK X= -75.25 FLANGE FOUND CORRODED BETWEEN STA 1189 TO STA 1209. CORROSION REMOVED AS PER SRM 51-21-01 VOL. 2 REV. 40, MATERIAL REMOVED 0.042", ORIGINAL THICKNESS 0.080", REMAINED THICKNESS 0.038", AND FOUND EXCEEDED LIMIT AS PER SRM 53-70-00 FIG. 3 VOL. 1 REV. 40. REPAIR CARRIED OUT AS PER SRM 53-00-52 FIG 201 REPAIR 1 REV. 41. REPAIR CLASSIFIED AS MAJOR AS PER GMM 6-2-100 REV. 107.