What was found
THE INCOMING FLOORBEAM REPAIR AT STA 1661 WILL INTERFERE WITH THE INSTALLATION OF SEAT TRACKS AND CREASE BEAMS. REMOVED FLOORBEAM AT STA 1661 IAW SRM 51-40-02, FABRICATED NEW BEAM FROM BAC 1518-338 BATCH NR 0001674883 IAW DWG 146N5090, ANODIZED IAW BAC 5019 REV 4. LOCATED AND DRILLED IAW SRM 51-40-05, TEATED AND PRIMED IAW SRM 51-20-01, PAINTED IAW AMM 51-21-10-7 AND INSTALLED IAW SRM 51-40-02, THIS IS A CATEGORY "A" MAJOR REPAIR NO FOLLOW-UP NEEDED.