What was found
NLG WW, LT NLG TRUNNION FITTING FOUND CRACKED. REPAIRED AS PER SRM 53-10-14 FIGURE 202 REPAIR 2, REVISION 41. REPAIR CLASSIFIED MAJOR AS PER GMM 6-2-100, REVISION 108. INITIAL INSPECTION TO BE CARRIED OUT AT 1500 CYCLE AND REPETITIVE INSPECTION TO CARRY OUT AT 1500 CYCLE AS PER SRM 53-10-14 REPAIR 2 TABLE 201, REVISION 41.