What was found
LOST HYD 3 FLUID AT LEVEL OFF ALT. THE LOSS WAS RA PID BEFORE PUMPS COULD BE SECURE. ALT GEAR WAS EXT ENDED. UNABLE TO GET CTR FEAR DOWN. LANDED APPROX 15000 NR OVERWEIGHT. PUMPED 9000 NR OF FUEL. FOUND HYD LINE IN RT W/W BETWEEN NR 3 HYD RES C/L/G CNTL VALVE BROKEN. MFG AND INSTALLED HYD LINE USING PERMASWAGE FITTINGS IAW CH 20. LK CK GOOD. SERVICED HYD JACKED AC AND SWUNG GEAR SEVERAL TIMES MOVED AC TO GATE RAN NR 3 ENG LEAK CHECK OF PUMPS AND FILTERS GOOD HYD QTY STABLE.