What was found
CORROSION AROUND FASTENER HOLES AT APU AIR INTAKE CUTOUT STA 1825 BET S 3R-6R. REMOVED CORROSION IAW SRM 51-10-02. BLENDED AREA L=15.0 W=1.0 D=0.025 ORIG MATERIAL 0.100. FOUND OUT OF LIMITS IAW SRM 53-80-01 DET III. REMOVED ANGLE IAW SRM 51-40-02. REMOVED FAIRING IAW SRM 51-40-02. REMOVED STRAP AT STA 1825 S-3R TO S-6R IAW SRM 51-40-02. RECEIVED NEW STRAP. LOCATED AND DRILLED IAW SRM 51-40-05. TREATED AND PRIMED IAW SRM 51-20-01. INSTALLED STRAP IAW SRM 51-40- 02. INSTALLED FAIRING IAW SRM 51-40-02 AT STA 1825. INSTALLED ANGLE IAW SRM 51-40-02. CATEGORY "A" MAJOR REPAIR.