What was found
STA 740, FLOORBEAM, RBL 46 TO RBL 60 UPPER FLANGE CORRODED. REMOVED CORROSION, EVALUATED FOUND OUT OF LIMITS, MAT THICKNESS 0.125", MAT BLENDED .018", REMAINING MAT .107", IAW SRM 53-00-51, FIG 101, PG 101, DETAIL III, REMOVED FLOORBEAM IAW SRM 51-40-02, LOCATED & DRILLED NEW FLOORBEAM IAW SRM 51-40-05, PROTECTIVE TREATMENT AND TOP COAT APPLIED IAW SRM 51-20-01, INSTALLED NEW FLOORBEAM IAW SRM 51-40-02. CATEGORY 'A' MAJOR REPAIR.