What was found
MAIN DECK CARGO RT STA 1601, L-12 FRAME FOUND DENTED. REPAIR CARRIED OUT AS PER SRM 53-00-07 REPAIR 2 FIG 201 REV 43. INITIAL INSPECTION TO BE CARRIED OUT ON 14,500 FLT CYCLE AND REPETITIVE INSPECTION ON 9,500 FLT CYCLE AS PER SRM 53-00-07 REPAIR 2 TABLE 201 REV 43. REPAIR CLASSIFIED MAJOR PER GMM 6-2-100 REV 110.