What was found
MAIN DECK FLOORBOARD BETWEEN FRAME 53 AND FRAME 54, LBL 78 AND LBL 98 IS BROKEN OFF AT THE AFT END. FABRICATED NEW FLOOR PANEL IAW DWG 25-005, REV "H".
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN DECK FLOORBOARD BETWEEN FRAME 53 AND FRAME 54, LBL 78 AND LBL 98 IS BROKEN OFF AT THE AFT END. FABRICATED NEW FLOOR PANEL IAW DWG 25-005, REV "H".