What was found
BULK CARGO COMPARTMENT FLOORBEAM T-CAP HAS 2 DRILL STARTS ON THE UPPER SURFACE AT FRAME 66, LBL 3". DAMAGE REMOVED PER SRM 51-40-21 AND NEW T-CAP WAS FITTED AND DRILLED PER SRM 51-40-44 AND INSTALLED PER SRM 51-40-21; PARA 6 & 7.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BULK CARGO COMPARTMENT FLOORBEAM T-CAP HAS 2 DRILL STARTS ON THE UPPER SURFACE AT FRAME 66, LBL 3". DAMAGE REMOVED PER SRM 51-40-21 AND NEW T-CAP WAS FITTED AND DRILLED PER SRM 51-40-44 AND INSTALLED PER SRM 51-40-21; PARA 6 & 7.