What was found
CORROSION TOP TEE CAP FLOORBEAM MAIN CABIN STA 560 LBL 25 - LBL 45. CUTOUT DAMAGED AREA, FABRICATED 2 ANGLES AND FILLER, TREATED AND PRIME PARTS AND AREA, INSTALLED FLOORBEAM REPAIR AT BS 560 BETWEEN LBL 25 - LBL 45 IAW SRM 53-10-8, FIG 8 AND SRM 51-30-5, SRM 51-10-2, AND SRM 51-30-2.