What was found
UNABLE TO INSTALL CHANNEL SPLICE, BETWEEN STA 1620 TO STA 1640, RBL 60, WL 208.1, WILL HAVE SHORT EDGE CONDITION AT (1 EA) 0.100 HOLE LOCATION AT BS 1620 - 1640 RBL 60 A CREASE BEAM REPAIR WAS ACCOMPLISHED DUE TO DISCREPANCY EFFECTING THE PTF CONVERSION ON MAE W/C 118350449EZR06 AND MAE EA 757-5361-16-F3249. CLASSIFIED AS A MAJOR.