What was found
AFT CREW DOOR PREVIOUS REPAIR NOT IAW SRM REPAIR PROCEDURES. REPAIRED IAW SRM AND RE-INSTALLED IAW AMM 52-13-11/52-13-20. SRM 52-10-00 FIG 204 PARA 7. REPAIR IS MAJOR,
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFT CREW DOOR PREVIOUS REPAIR NOT IAW SRM REPAIR PROCEDURES. REPAIRED IAW SRM AND RE-INSTALLED IAW AMM 52-13-11/52-13-20. SRM 52-10-00 FIG 204 PARA 7. REPAIR IS MAJOR,