What was found
ON CLIMBOUT THRU 20K NOTICED OCCASIONAL VIBRATION IN THE CONTROL COLUMN SPOILERS WERE SLIGHTLY DEPLOYED. NUMEROUS RESETS WITH THE SPOILER HANDLE. SLIGHTLY DEPLOYING SPOILERS DID NOT HELP. ON BLOCK IN DISCOVERED LT INBD FLAP OUTER CABLE BROKEN, ALONG WITH AFT FLAP PANEL DAMAGED BY AFT FLAP NOT EXTENDING ALL THE WAY ON THE OTBD SIDE. INBOARD T/E FLAP EXTENDED NORMALLY. R & R LT INBD FLAP OTBD FLAP ACTUATOR CABLES IAW AMM 27-51-005-4, ACFT OK FOR SERVICE. ASSOCIATED INSP PANELS, FLAP TRACK FAIRING AND SKIN RESECURED IAW SMP. ACFT OK FOR SERVICE.