What was found
AFT PIT BS 950A FRAME SHEAR TIE IS CORRODED ON FWD SIDE BETWEEN S26-27L. REMOVED SHEAR TIE IAW SRM 53-10-04 FIG 15. FABRICATED, HEAT TREATED, LOCATED & DRILLED NEW SHEAR TIE, & INSTALLED IAW SRM 51-10-06, SRM 53-10-01 FIG 1, SRM 53-10-04 FIG 15, SRM 51-10-02, FAS ER 2-37153-801.