What was found
IMPROPER SPACING BETWEEN FASTENERS IN SHEAR TIE AT BS 950A, FORWARD AND AFT, BETWEEN STR 29R AND 28R. REMOVED SHEAR TIE IAW SRM 51-30-2 LOCATED,DRILLED AND DEBURRED NEW SHEAR TIE IAW SRM 51-30-5 INSTALLED SHEAR TIE IAW SRM 51-30-2
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
IMPROPER SPACING BETWEEN FASTENERS IN SHEAR TIE AT BS 950A, FORWARD AND AFT, BETWEEN STR 29R AND 28R. REMOVED SHEAR TIE IAW SRM 51-30-2 LOCATED,DRILLED AND DEBURRED NEW SHEAR TIE IAW SRM 51-30-5 INSTALLED SHEAR TIE IAW SRM 51-30-2