What was found
FLOORBOARD 242 ZJ HAS 5 AREAS WERE CLEVIS ATTACHES THAT ARE CRUSHED AND ALSO A 9 '. CRACK FABRICATED REPLACEMENT FLOORBOARD 242 ZJ IAW DWG SRZ 25-005, REV J.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOORBOARD 242 ZJ HAS 5 AREAS WERE CLEVIS ATTACHES THAT ARE CRUSHED AND ALSO A 9 '. CRACK FABRICATED REPLACEMENT FLOORBOARD 242 ZJ IAW DWG SRZ 25-005, REV J.