What was found
MAIN DECK UPPER CARGO COMPARTMENT, UNDER FLOOR AT CENTER WING TANK BETWEEN STATION 1219 TO STATION 1239, "X" = -27.5 FOUND SURFACE CORROSION AT FASTENERS AREA. CORROSION REMOVED IAW SRM 51-21-01, REV 49. ORIGINAL MATERIAL THICKNESS = 0.175", REMAINING THICKNESS = 0.145", MATERIAL REMOVED = 0.030" AND FOUND ACCEPTABLE IAW EA 1-5730-160022. REPAIR CLASSIFIED AS MINOR GMM 6-2-100, REV 114.