What was found
MAIN DECK CARGO FLOORBOARD 251BH HAS 2 CRACKS 4 & 6 INCHES AROUND CLEVIS ADAPTERS. FABRICATED REPLACEMENT FLOOR PANEL IAW DWG SRZ 25-005 REV J.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN DECK CARGO FLOORBOARD 251BH HAS 2 CRACKS 4 & 6 INCHES AROUND CLEVIS ADAPTERS. FABRICATED REPLACEMENT FLOOR PANEL IAW DWG SRZ 25-005 REV J.