What was found
FUSELAGE INTERIOR RT SIDE THERE IS CORROSION ON THE APU INLET ATTACH STRUCTURE FROM BS 1787, STRINGER 3 TO 6R. CORROSION REMOVED & FOUND OUT OF LIMIT IAW SRM 53-80-15, FIG 101, DETAIL 1, REV 107. CORRODED STRAP R & R WITH NEW STRAP, IAW DWG 148N3105, SHT 1, REV C. REPAIR CLASSIFIED MAJOR, IAW GMM 6-2-100.