What was found
FOUND FLOOR SUPPORT TIE-DOWN INBD AREA WITH CORRODED. REMOVED AND REPLACED IAW SRM 51-31-01, REVISION 53. NEW FLOOR SUPPORT FABRICATED IAW DWG WSP 0668, REVISION B. REPAIR CLASSIFIED MAJOR IAW GMM 6-2-100 REVISION 118.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FOUND FLOOR SUPPORT TIE-DOWN INBD AREA WITH CORRODED. REMOVED AND REPLACED IAW SRM 51-31-01, REVISION 53. NEW FLOOR SUPPORT FABRICATED IAW DWG WSP 0668, REVISION B. REPAIR CLASSIFIED MAJOR IAW GMM 6-2-100 REVISION 118.