What was found
DURING TRANSIT CHECK FOUND NR 1 MLG BRAKE OVERHEATED & HYD LEAK FROM THE BRAKE ACTUATOR RESULTED IN SMALL BRAKE FIRE & WAS EXTINGUISHED. PERFORMED THE LT SIDE LG AREA INSPECTION IAW AMM 32-40-00-06, NO ABNORMALITY FOUND. PERFORMED THE BTMTP RT SIDE TEST IAW AMM 32-46-00-5, TESTED NORMAL. R & R THE NR 1 BRAKE ASSEMBLY IAW AMM 32-43-20-4, BTMTP TESTED NORMAL. BRAKE TEMP INDICATED NORMAL R & R NR 1 MAIN TIRE ASSEMBLY IAW AMM 32-41-01-4, TIRE PRESS INDICATED NORMAL. BTMTP TESTED NORMAL, ACFT OK FOR SERVICE.