What was found
NR 1 ENGINE HAD A SUSPECTED STALL ON ROLLOUT. TOWER REPORTED LT ENGINE ON FIRE. STOWED THRUST REVERSERS BY 60 KIAS & STOPPED ACFT, SHUTDOWN ENGINE, NO OTHER FIRE INDICATIONS, VISUALLY CONFIRM NO SMOKE. ON SHUTDOWN IN RAMP ADC 1 FAULT OCCURRED & STAYED ON. VISUAL CHECK ON NR 1 ENGINE INLET & EXHAUST PIPE ARE OK. INSPECTION COMPLIED WITH IAW TSM 72-00-40 FIGURE 132, NO DEFECT FOUND. PERFORMED BORESCOPE INSPECTION ON 5TH,6TH AND 10 STAGES OF HPC. EXAMINED 1ST STAGE VANES OF HIGH PRESSURE TURBINE. ALSO PERFORMED INSPECTION THROUGH AP-4,AP-6, AND AP-7. INSPECTED CONDITION OF HPC BLADES. ALL INSPECTIONS ARE SATISFACTORY. INSPECTION CARRIED OUT IAW 72-00-00-06. RAN NR 1 ENGINE IAW JRH. ALL PARAMETERS ARE NORMAL.