What was found
REJECTED TAKEOFF FOR AN ENGINE FAIL LIGHT. NR 3 ENGINE WOULD NOT FULLY SPOOL UP. PERFORMED GVI FOR BOTH ENGINE INTAKE & EXHAUST AREA, FOUND NO DEFECTS. NO FAULTS STORED ON ALL EEC. PERFORMED FADEC INTERFACE TEST ON BOTH FCC-1 & FCC-2. ALL TEST PASSED IAW MM 22-01-10-5. DEU NR 3 HAS NO FAULT. ENGINE PRESSURE RATIO INDICATOR INOPERATIVE & AUTO THROTTLES INOPERATIVE. ACFT CATII. RAN NR 1 & NR 3 ENG IAW JRH, FOUND NORMAL ENGINE INDICATION. DUE TO HISTORY FOR NR 3 ENG EPR IND SPLIT AT TAKEOFF POWER ASSURANCE TABLE ON AMM 71-02-09-5-2. ACFT OK FOR SERVICE.