As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
EICAS RT ENGINE OVERHEAT COMPLIED WITH QRH. INSTALLED HP2 FLEX DUCT ASSY IAW MM 36-11-01-4-1, REINSTALLED HP 6 DUCT IAW MM 36-11-4- 1. PLACED FOIL AROUND ALL DUCTING. PREFORMED HIGH POWER RUN IAW JRH WITH NO FAULTS AFTER ENGINE RUN RECHECKED FOIL AROUND DUCTING ALL CHECKED GOOD.