What was found
BOTH FLAP SYS 1 & 2 FAILED ON APPROACH. INTERROGATED SFCC 1 & 2. BOTH SHOWED JAM. RESET & DID BITE CHECK, BOTH PASSED. CHECKED LT & RT FLAP TORQUE LIMITERS. LT FLAP TORQUE LIMITER WAS POPPED IAW MM 27-51-00-05. WILL OPS CHECK FLAPS WHEN DONE UNLOADING. DURING BACKLASH CHECK IAW TSM 27-50-02 FIG 106, FOUND LT TORQUE LIMITER LEAKING & BAD. R & R LT FLAP TORQUE LIMITER 5294 IAW AMM 27-54-12-04. PASSED BACKLASH CHECK IAW TSM 27-50-02. STILL REQUIRES OPERATIONS CHECK AFTER TROUBLESHOOTING FLAP FAULT. FAILED OPERATIONS CHECK OF FLAPS IAW MM 27-54-00-05. FOUND LT FLAP TORQUE LIMITER POPPED. BACKLASH CHECKED ON 1 & 2 FLAP JACKSCREWS IAW TSM 27-50-02 FIG 101 BLOCK 11. STARTED ON BLOCK 12 OF TSM 27-50-02 FIG 101. NO MOVEMENT BETWEEN SCREW JACK 2 & 3. NEED TO CHECK BETWEEN 3 & 4 FLAP SCREW JACK NEXT.