What was found
DURING CLIMB OUT NR 1 PITCH TRIM CLICKED OFF, NO RESET, NR 2 PITCH TRIM RETURNED TO DEPARTURE. REMOVED AND REPLACED THE PROXIMITY DETECTOR PROCESSING UNIT IAW AMM 32-31-71-04. OPS CHECKED GOOD. REPLACED THE NLG RELAYS 96GB AND 141GB IAW ESPM FOR FLAGGED FAULTS ON MTP.