What was found
REJECTED TAKEOFF DUE TO BOTH GENERATORS 1 & 2 FAULTED. BITE CHECKED GPCU AND FOUND THE NR 1 AND 2 GCU FAILED. R & R THE GPCU IAW AMM 24-41-11-04, PERFORMED OPERATIONAL TEST IAW AMM 24-41-00-05, TESTED NORMAL. R & R THE NR 1 GCU IAW AMM 24-22-12-04, PERFORMED AN OPERATIONAL TEST OF THE GCU IAW AMM 24-41-00-05, TESTED NORMAL.