What was found
NR 2 GENERATOR FAULT ILLUMINATED DURING TAKEOFF ROLL, NR 1 GENERATOR FAULT ILLUMINATED DURING CLIMB OUT OF 2000 FT WITH ECAM. PERFORMED QRH AND RECOVERED THE NR 1 GENERATOR. R & R NR 2 GCU IAW AMM 24-22-12-04, OPS CHECKED NORMAL, OK FOR SERVICE. RAN THE NR 2 ENGINE IAW JRH, GENERATOR CARRIED A LOAD. R & R THE NR 1 ENGINE GCU IAW AMM 24-22-12-04, OPS CHECKED NORMAL, OK FOR SERVICE. RAN THE NR 1 & 2 ENGINES IAW JRH. OPS CHECKED NORMAL, OK FOR SERVICE.