What was found
RIGHT HAND WING INBOARD FLAP VANE CENTER HINGE FITTING CAVITY WALL CORROSION. RIGHT HAND WING INBOARD FLAP VANE CENTER HINGE FITTING CAVITY WALL CORROSION REMOVED AS PER SRM 51-21-01-0G AND MEASURE REWORKED AREA, ORIGINAL THICKNESS 0.100Ï¿½, MATERIAL REMOVED 0.048Ï¿½ AS PER EA: 1-5750-T0352291 P1 TITLE: WING Ï¿½ FLIGHT SURFACES Ï¿½ CORROSION BLENDOUT ON SIDEWALL OF RHW INBD FLAP VANE, #2 AND #3 VANE SPRT INNER BRACKETS. REPAIR CLASSIFIED AS MINOR PER GMM 6-2-100.