What was found
EMPENNAGE, HIGH FREQUENCY EDDY CURRENT OPEN HOLE INSPECTION FOUND ADDITIONAL FASTENER HOLES NR 4 & 6 CRACKED AT NR 4 BANJO FITTING RIGHT HAND AFT FLANGE AREA STATION 2164 & ONE FASTENER HOLE OVER-COUNTERSUNKED, UNABLE TO INSTALL HLT335-8-14 AS PER SRM 55-30-02-2R FIGURE 202 REPAIR 5. TWO EACH FASTENER HOLES CRACK DURING HIGH FREQUENCY EDDY CURRENT OPEN HOLE INSPECTION AT NR 4 BANJO FITTING RT HAND SIDE AFT FLANGE 4TH AND 6TH HOLE AND 01 EACH OVERCOUNTERSUNKED FASTENER HOLE AT RT HAND SIDE AFT FLANGE AT STATION 2164 REPAIRED PER EA 1-5530-T0341085 A P3 TITLE STABILIZERS - VERTICAL STAB - CRACK REPAIR ON VERTICALSTABILIZER REAR SPAR RT FWD FLANGE. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100.