What was found
MAIN DECK CARGO COMPARTMENT-CABIN, DURING REMOVAL OF INSULATION BLANKET FOR SUPPORT BRACKET RECTIFICATION, FOUND FRAME AT STATION 5-32, LONGERON 12 LEFT CRACKED. MAIN DECK CARGO COMPARTMENT-CABIN AT LEFT HAND FRAME STATION 5-32, LONGERON 12 LEFT CRACKED REPAIRED AS PER SRM 53-00-07-2R FIGURE 201 REPAIR 2. REPETITIVE INSPECTION REQUIRED - INITIAL INSPECTION AT 14,500 CYCLES AND REPETITIVE INSPECTION AT 9,500 CYCLES TO BE CARRIED OUT BY HIGH FREQUENCY EDDY CURRENT INSPECTION AS PER SRM 53-00-07-2R TABLE 201 REPAIR 2. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100.