Service difficulty report · Warning Message · Boeing 757236

Difficulty date
August 13, 2021
Submitted
August 16, 2021
Operation
Air carrier
Aircraft
N946FD
Make and model
Boeing 757236
Aircraft serial
24398
Aircraft time
53,317 hours, 33,013 cycles
Part
Warning Message
Condition
False Activation
Location
Te Flaps
Stage of operation
DE
How discovered
O
Nature of condition
N
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CONFIGURATION, AFTER MOVING FLAP LEVER TO 25, GOT TE FLAP DISAGREE EICAS MESSAGE. DISCON APPROACH, RAN QRH, & LANDED UNEVENTFUL. EMERGENCY DECLARED. DRAINED & SERVICED LT- I/B FLAP I/B TE FLAP TRANSMISSION IAW MM 12-13-06-3. RAN FLAPS & GOT FLAP ISNL VALVE EICAS MESSAGE. RAN LT ENG & RAN FLAPS WITH SAME RESULT. CLEARED FLAP ISLN VALVE MESSAGE IAW FIM FAULT PROCEDURE 27-51. RAN ENGINES IAW JRH W/ L,C,R ACMP ON. OPS FLAPS MULTIPLE TIMES FROM 0 - 25 - 30 WITH NO STATUS MESSAGE. IAW FIM 27-51 FT 818 BLOCK 45 THE SYS IS OK. NO MESSAGE APPEARED. ALSO NOTE IAW FIM 27-51. IF JUST THE L ACMP TO OPS FLAPS USED & GO FULL TRAVEL, MAY GET A FLAP ISLN VALVE MESSAGE. IF SO, SYSTEM IS OK.