What was found
PDIS 854 28-41 2132 08DEC21 ANC APPROX 2.5 HRS INTO FLT HAD FUEL IMBALANCE ON EICAS. AS WE RAN ECL WE NOTICED DISCREPANCIES IN TOTALIZER FUEL AND CALCULATED FUEL ON PROG P.2. THESE 2 ITEMS LED US TO RUN FUEL DISAGREE AND FUEL LEAK CHECKLISTS. AFTER ALL THIS AND CONSULTING WITH GOC, MOCC, JOHN HUNT AND DON ULSH IT WAS DECIDED TO DIVERT TO PANC. FACT 08DEC21 20:05 ANC CHECKED EXISTING FAULTS IN MAT , NOTED ONE INTERMITTENT FAULT FQPU MAINTENANCE MSG 28-20200. NO EXISTING RELATED FAULTS. CW FIM TASK 28-4100-810-824. R&R FQPU IAW M/M 28_41_01_4_0 . SOFTWARE CHK SATIS. ADJ/TEST OF FUEL QTY SATIS., VERIFIED QTY WITH STICKS, OK FOR SVC.