What was found
CENTER CARGO - STATION 5-11 TO STATION 5-32 LONGERON 50 LEFT FOUND CORROSION. CORROSION AT CENTER CARGO - STATION 5-11 TO STATION 5-32 LONGERON 50 LEFT REMOVED AND FOUND EXCEED LIMIT AS PER SRM 53-00-05-2R REPAIR 1 FIGURE 203. REPAIR CARRIED OUT AT CENTER CARGO STATION 5-2.21 TO STATION 5-62.45 LONGERON 50 LEFT AS PER EA .#:1-5310-T0341526 A P2 TITLE : FUSELAGE - MAINFRAME - CORROSION REPAIR ON CENTER FUSELAGE SECTION LONGERON L-50L AT STA5-62.450. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100.