What was found
MAIN DECK- MCD ENTRY AREA- STA 695 LBL 100 FLOOR BOARD IS SPONGY. FABRICATED NEW FLOOR PANEL AT STA 695 LBL 100 (231LF) PER FEDEX DRAWING SRZ-25-005.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN DECK- MCD ENTRY AREA- STA 695 LBL 100 FLOOR BOARD IS SPONGY. FABRICATED NEW FLOOR PANEL AT STA 695 LBL 100 (231LF) PER FEDEX DRAWING SRZ-25-005.