Service difficulty report · Oil System · Boeing 75723A

Difficulty date
October 27, 2022
Submitted
October 31, 2022
Operation
Air carrier
Aircraft
N922FD
Make and model
Boeing 75723A
Aircraft serial
24293
Aircraft time
73,371 hours, 27,626 cycles
Part
Oil System
Condition
Low Pressure
Location
Apu
Stage of operation
CR
How discovered
O
Nature of condition
J, G
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

APU SHUTDOWN AT CRUISE RESULTING IN SINGLE GENERATOR REMAINING. EMERGENCY DECLARED AND RETURNED TO LFPG FOR NORMAL LANDING. EMERGENCY DECLARED, APU SHUT DOWN IS RELATED TO WRI 49-90/3559 WITH CORRECTIVE ACTION , APU OIL QTY IN STATUS , SUDDEN APU OIL CONSUMPTION . ORIG SUB DATE: 10/29/2022

More about the Boeing 757-23A