What was found
NR #7 READ "FLOORBOARD DAMAGED BETWEEN STATIONS 1100-1197". INSPECTED NOT ACCEPTED. MAIN DECK FLOORBOARD REPAIR MISCLASSIFIED AS MINOR REPAIR. RII BUYBACK FOR MAJOR REPAIR MISSED ON SHIFT REF GMM 6-1-800. FABRICATED NEW FLOORBOARD (251AFF) (MPN: 146T5869-8) FOR MAIN DECK CARGO COMPARTMENT RBL 11 BETWEEN STA. 1100-1197 IN IN REF. TO SRM 53-00-50-2R AND FEDEX DRW# SRZ-25-005. THIS IS A MAJOR REPAIR. INSTALLATION OF FLOORBOARD ACCOMPLSHED ON WO#89007 NR#005 GPF STEP# 4.