Service difficulty report · Flap System · Airbus A300F4605R

Difficulty date
May 21, 2025
Submitted
May 21, 2025
Operation
Air carrier
Aircraft
N654FE
Make and model
Airbus A300F4605R
Aircraft serial
738
Aircraft time
40,445 hours, 22,231 cycles
Part
Flap System
Condition
Stuck
Stage of operation
CL
How discovered
O
Nature of condition
F
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON DEPARTURE ON A SLATS/FLAPS 15/20 TAKEOFF AT COMMENCEMENT OF ATTEMPTED FLAP RETRACTION WE RECEIVED ECAM FOR FLAPS SYS 1 AND 2 FAULT/FLAPS STUCK. WE FOLLOWED THE ECAM AND SUBSEQUENT QRH PROCEDURE WITH NO SUCCESS WITH CYCLING. THE SLATS AND FLAPS REMAINED STUCK AT THE 15/20 POSITION. WE RETURNED TO KMEM TO AN UNEVENTFUL APPROACH AND LANDING. PERFORMED BOTH WINGS FLAP LUBE AND GEAR BOX SERVICING REF TSI 27-80/7396, STILL NEEDS OPS CHECKS TO CHECK FOR OPERATION AND NO JAMMING FAULTS AMM: 27-51-00-5. PERFORMED OPS TESTS OF SLATS AND FLAPS SYSTEMS. MULTIPLE CYCLES FOUND NO FAULTS OR DEFECTS. OPS TESTS GOOD AT THIS TIME. REF A300 AMM 27-51-00-5.

More about the Airbus A300 F4-605R