What was found
DURING ACCOMPLISHING W/C : 57.11.01.1, FOUND CRACK ON UPPER AUXILLIARY TANK LOWER STRINGER S-47, ALONG XCW 17. CRACKED STRINGER S-47 ALONG XCW 17 AT UPPER AUXILLIARY TANK LOWER AREA REPAIRED AS PER MD-11 SRM 57-10-03-2R FIGURE 201 REPAIR 1. REPAIR CLASSIFIED AS MAJOR PER GMM 6-2-100.