What was found
MAIN DECK CARGO FLOOR FITTING FOUND CORROSION AT STA1434 RBL6.5. MAIN DECK CARGO FLOOR FITTING CORROSION REMOVED AND EVALUATED : MEASURED THE REWORKED AREA BELONG TO ZONE C,THE MAX ALLOWABLE BLEND OUT IS 0.002, THE MAX CLEAN UP DEPTH IS X=0.058Ï¿½>0.002Ï¿½ AND FOUND OUT OF LIMIT AS PER B777 SRM 53-00-52-1A ALLOWABLE DAMAGE 3 FIG 102,REV47.6. THE NEW FITTING FABRICATED AS PER BOEING DWG 457W1013 SH4 REV D.THE DAMAGE FITTING REMOVED AND REPLACED AS PER B777 SRM 51-10- 02-0G,SRM 51-20-01-0G REV47.6 AND EA G-2550-T0383741 P1, TITLE: EQUIP,FURNISHINGS- CARGO/LOADING SYSTEM-MDC CARGO HANDLING SYSTEM FITTINGS CORROSION REPAIR. THIS IS A MAJOR REPAIR PER GMM 6-2-100.