What was found
DURING PERFORMED CPCP CARD NR C53-224-01 PART 1 OF 3 FOR MAIN DECK CARGO COM'P FLOOR STRUCTURE, THE SEAT TRACK AT STA BS 640+3 AND BS 640+10 LBL. 0 WAS FOUND LEVEL 2 CORROSION. REPAIR METHOD IAW SRM 53-10-5 FOR FURTHER PROCESSING.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING PERFORMED CPCP CARD NR C53-224-01 PART 1 OF 3 FOR MAIN DECK CARGO COM'P FLOOR STRUCTURE, THE SEAT TRACK AT STA BS 640+3 AND BS 640+10 LBL. 0 WAS FOUND LEVEL 2 CORROSION. REPAIR METHOD IAW SRM 53-10-5 FOR FURTHER PROCESSING.