What was found
DURING C-CHECK, FOUND CORROSION ON THE REINFORCEMENT CHORD AT FUSELAGE STATION 1176.9 RBL 62.5. REMOVED AND REPLACED REINFORCEMENT CHORD IAW BOEING 727 SRM 51-30-2. THE AIRCRAFT WAS RETURNED TO SERVICE. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, FOUND CORROSION ON THE REINFORCEMENT CHORD AT FUSELAGE STATION 1176.9 RBL 62.5. REMOVED AND REPLACED REINFORCEMENT CHORD IAW BOEING 727 SRM 51-30-2. THE AIRCRAFT WAS RETURNED TO SERVICE. (M)