What was found
AFTER TAKE OFF PORT SIDE PASSENGER WINDOW SUPPORT BROKE. REMOVED /REPLACED PORT AND STARBOARD TORQUE TUBES AND ONE EACH EMERGENCY CATCH SUPPORT ON PORT (FORWARD) WINDOW IAW MANUFACTURER'S SPECS. PART TOTAL TIME: 7,570.7 HOURS. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFTER TAKE OFF PORT SIDE PASSENGER WINDOW SUPPORT BROKE. REMOVED /REPLACED PORT AND STARBOARD TORQUE TUBES AND ONE EACH EMERGENCY CATCH SUPPORT ON PORT (FORWARD) WINDOW IAW MANUFACTURER'S SPECS. PART TOTAL TIME: 7,570.7 HOURS. (X)