What was found
FTW - FOUND RIGHT SIDE, FUSELAGE AREA, INBOARD OF NR 1 SLAT HAS A VERTICAL RIB, BENT AND CRACKED. REMOVED DAMAGED RIB. FORMED NEW RIB. HEAT TREATED RIB TO T-6 CONDITION. INSTALLED FORMED RIB IAW DC9 SRM 51-30-3. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FTW - FOUND RIGHT SIDE, FUSELAGE AREA, INBOARD OF NR 1 SLAT HAS A VERTICAL RIB, BENT AND CRACKED. REMOVED DAMAGED RIB. FORMED NEW RIB. HEAT TREATED RIB TO T-6 CONDITION. INSTALLED FORMED RIB IAW DC9 SRM 51-30-3. (M)