What was found
FLL - FLT 380 - ON TAKEOFF ROLL, THE THROTTLES MATCHED N1 BUT THE EPRS WERE OFF, NR 1 1.70, NR 2 1.99, UPON PUSHING NR 1 THROTTLE UP TO MATCH EPRS THE NR 1 N1 WENT TO 101, ABORTED AT SPEED 105 MAX. PERFORM OPERATIONAL CHECK ON NR 1 ENGINE EPR INDICATION. PERFORMED TROUBLESHOOTING PER MM 77-11-01. FOUND VERY LOOSE B-NUT AT PT7 LINE JUNCTION. TIGHTENED B-NUT, CHECKED ALL LINES FOR SECURITY AND CHECKED ALL FITTINGS, PT2 AND PT7 LINES LEAK CHECK OK. ITEM DUE OPS CHECK ON R/U SEE ITEM 31267-1. FOUND 2 PT7 LINES CRACKED AND LEAKDING REMOVED AND REPLACED LINES ALSO TRIMMED NR 1 AND NR 2 ENGINE PER MM 71-00-00 OPS AND LEAK CHECK OK. (M)