What was found
FTW - FORWARD CABIN SUBFLOOR CORRODED AT FLOOR SUPPORT LBL 9 STAITON 160 TO 200 AND HAS A PINHOLE FROM SCREW STATION 168. CUTOUT FLOOR WEB. FABRICATED NEW WEB. FABRICATED SPLICE. INSTALLED FLOOR WEB. INSTALLED SPLICE REPAIR. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FTW - FORWARD CABIN SUBFLOOR CORRODED AT FLOOR SUPPORT LBL 9 STAITON 160 TO 200 AND HAS A PINHOLE FROM SCREW STATION 168. CUTOUT FLOOR WEB. FABRICATED NEW WEB. FABRICATED SPLICE. INSTALLED FLOOR WEB. INSTALLED SPLICE REPAIR. (M)