As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
F/A REPORTED SMELLY SOCKS ROW 24 AFT. LATE ON APPROACH 5000 FEET IDEL POWER BOTHE PACKS RUNNING. PERFORMED TSM 05-50-00-810-831-A. ISOLATED PACKS, ENGINES. PERFORMED ENGINE IDLE RUN IAW AMM 71-00-00-860-823-A. NO DIRTY SOCK SMELL OR ODORS DETECTED. A/C OK FOR SERVICE.