What was found
DURING DESCENT AT 5000 FT, FUME EVENT, SECURED THE NR 1 PACK. F/A REPORTED FUMES FROM ROW 1 TO ROW 5. SECURED THE NR 2 PACK . PERFORMED TSM 05-50-00-810-831A, FOUND THE NR 1 ENGINE DEOILER LEAKING OIL. REMOVED AND REPLACED THE DEOILER SEALS IAW AMM 72-60-31. RAN THE NR 1 ENGINE IAW AMM 71-00-00. LEAK CHECK GOOD.PERFORMED VISUAL INSPECTION OF THE BLADES AND MODULE NO SIGNS OF LEAKAGE OR CONTAMINATION. ISOLATED THE NR 1 ENGINE, NR 1 A/C PACK. FOUND NO ODER OR FUMES PRESENT. ACFT OK FOR CONTINUED SVS