What was found
MHV - FLOORBOARD 27, 3 HAT SECTIONS CRACKED AT ONE END AND 2 SECTIONS CRACKED AT OTHER END. INSULATION BATTING MISSING ON ONE END, FALLING APART ON THE OTHER, AND UNBONDED AND FALLING APART AT A FEW AREAS IN THE CENTER SECTION. REMOVED 5 CRACKED HAT SECTIONS, DURING REWORK FOUND 4 SKIN CRACKS. FABRICATED 5 HAT SECTIONS, 5 HAT SECTION DOUBLERS, 2 FILLERS AND 3 DOUBLERS. ALODINED AND PRIMED PER SRM 51-10-3. REPAIRED PER SRM 53-05, FIG 1. INSTALLED FASTENERS PER SRM 51-30-2 AND 51-30-8. REBONDED BATTING PER MM 25-22-0. (M)