What was found
MHV - AFT FLOOR PANEL HAS DELAMINATING DOUBLERS RIVETS PULLED OUT OF HAT CHANNELS AND TEARS IN TOP SKIN OF PANEL. REPAIRED FLOOR BOARD PER SRM 53-05. FABRICATED SKIN REPAIR DOUBLERS PER SRM 53-05. ALODINED AND PRIMED PER SRM 51-10-3. STOP DRILLED TEAR IN TOP SKIN PER SRM 53-01. REPAIRED GRILLINER DOUBLERS PER MM 53-20-1. ALSO, REPLACED SPACER FOR FASTENER INSTALLATION PER SRM 53-05. (M)